The Strech Panel Iraq Diaries

The installation of the facade, masking 2,300 square metres, required ULMA's technical team to perform a arduous excellent control, which was performed in all places, such as manufacturing, cutting, sorting, packaging and shipping and delivery the panels separated into batches by region of application, ending with Probably the most sophisticated pi

read more